2008 – up to the present

Lock smith services, welding, crane work on the primary circuit of Nuclear Power Plant Mochovce
   

2008 – up to the present

Maintenance of the functional units of Nuclear Power Plant Mochovce, Nuclear Power Plant Bohunice and conventional power plants
   

2011 – 2012

Lock smith services, welding, crane work on the secondary circuit  E MO 34
   

2011 – 2012

Lock smith and welding services on cooling water pipe EMO 34
   

2011

Repair of the valves of a stoplog in MVE Tura
   

2011 – up to the present

Construction supervision, design work, scannering of the objects of EMO34
   

2012

Reconstruction of office building of EC
   

2013

Implementation project for electrical connection ADM Slovakia
   

2014

Manufacture of blanking flanges of the turbine for MEV Tura
   

2008 – up to the present

Core drilling for EMO 34
   

2014 – up to present time

Coordination work and preparing to launch EMO 34
   

2014 – up to the present

Folding accompanying technical documentation
   

2016

Sandblasting and coating application on super emergency tanks MO34
   

2016

Sandblasting and application of paint in the oil tanks EMO 34
   

2016

Bridge crane´s load testing in Dubnica nad Váhom and placing reactor´s pressure vessel of the 3rd and 4th block´s completion MO 34
   

2017

Painting of condensers TG 31 a TG 32 EMO 34
   

2018

Loading test of 250 t crane
   

2018

The stator replacement on the diesel generator MO34
   

2018

Service works on hydroelectric power station Kamýk
   

2019

Replacing the Generator Rotor US Steel Košice