2008 – up to the present
|
Lock smith services, welding, crane work on the primary circuit of Nuclear Power Plant Mochovce |
|
|
2008 – up to the present
|
Maintenance of the functional units of Nuclear Power Plant Mochovce, Nuclear Power Plant Bohunice and conventional power plants |
|
|
2011 – 2012
|
Lock smith services, welding, crane work on the secondary circuit E MO 34 |
|
|
2011 – 2012
|
Lock smith and welding services on cooling water pipe EMO 34 |
|
|
2011
|
Repair of the valves of a stoplog in MVE Tura |
|
|
2011 – up to the present
|
Construction supervision, design work, scannering of the objects of EMO34 |
|
|
2012
|
Reconstruction of office building of EC |
|
|
2013
|
Implementation project for electrical connection ADM Slovakia |
|
|
2014
|
Manufacture of blanking flanges of the turbine for MEV Tura |
|
|
2008 – up to the present
|
Core drilling for EMO 34 |
|
|
2014 – up to present time
|
Coordination work and preparing to launch EMO 34 |
|
|
2014 – up to the present
|
Folding accompanying technical documentation |
|
|
2016
|
Sandblasting and coating application on super emergency tanks MO34 |
|
|
2016
|
Sandblasting and application of paint in the oil tanks EMO 34 |
|
|
2016
|
Bridge crane´s load testing in Dubnica nad Váhom and placing reactor´s pressure vessel of the 3rd and 4th block´s completion MO 34 |
|
|
2017
|
Painting of condensers TG 31 a TG 32 EMO 34 |
|
|
2018
|
Loading test of 250 t crane |
|
|
2018
|
The stator replacement on the diesel generator MO34 |
|
|
2018
|
Service works on hydroelectric power station Kamýk |
|
|
2019
|
Replacing the Generator Rotor US Steel Košice |